Permit: TR-UTL-0326-00550
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
395 N SILVERBELL RD
Address NEW:
395 N SILVERBELL RD
Apply Date:
03/19/2026
Applicant:
Angeline Trejo
Description:
P.382034 - -RISERUP POLE 1 W/ NEW 1.25' W/ 24CT FIBER (20'). OVERLASH NEW AERIAL ID AND 24CT AERIAL FIBER FROM EXISTING POLE 1 TO EXISTING POLE 3 THROUGH EXISTING COPPER STRAND (160"). RISER DOWN AT POLE 3/NEW PED 1 WITH NEW FIBER (20') -PLACE NEW 2 PACK MICRODUCT AND JET NEW 24CT MICROFIBER FROM NEW PED 1 TO NEW PED 2 (IN CUSTOMER PARCEL) THROUGH EXISTING OCCUPIED 4" CONDUIT (455') -HAND DIG NEW 1.25" ID W, NEW 24CT NON-SHILEDED FIBER FROM EXISTING HH 12195 TO BASE OF POLE 1 (5').
Permit Reviews
Permit Number - TR-UTL-0326-00550
Permit Status: Issued
Permit Description: P.382034 -
-RISERUP POLE 1 W/ NEW 1.25' W/ 24CT FIBER (20'). OVERLASH NEW AERIAL ID AND 24CT AERIAL FIBER FROM EXISTING POLE 1 TO EXISTING POLE 3 THROUGH EXISTING COPPER STRAND (160"). RISER DOWN AT POLE 3/NEW PED 1 WITH NEW FIBER (20')
-PLACE NEW 2 PACK MICRODUCT AND JET NEW 24CT MICROFIBER FROM NEW PED 1 TO NEW PED 2 (IN CUSTOMER PARCEL) THROUGH EXISTING OCCUPIED 4" CONDUIT (455')
-HAND DIG NEW 1.25" ID W, NEW 24CT NON-SHILEDED FIBER FROM EXISTING HH 12195 TO BASE OF POLE 1 (5').
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/19/2026 | RIGHT-OF-WAY REVIEW v.1 | 04/01/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0326-00550
Permit Status: Issued
Permit Description: P.382034 -
-RISERUP POLE 1 W/ NEW 1.25' W/ 24CT FIBER (20'). OVERLASH NEW AERIAL ID AND 24CT AERIAL FIBER FROM EXISTING POLE 1 TO EXISTING POLE 3 THROUGH EXISTING COPPER STRAND (160"). RISER DOWN AT POLE 3/NEW PED 1 WITH NEW FIBER (20')
-PLACE NEW 2 PACK MICRODUCT AND JET NEW 24CT MICROFIBER FROM NEW PED 1 TO NEW PED 2 (IN CUSTOMER PARCEL) THROUGH EXISTING OCCUPIED 4" CONDUIT (455')
-HAND DIG NEW 1.25" ID W, NEW 24CT NON-SHILEDED FIBER FROM EXISTING HH 12195 TO BASE OF POLE 1 (5').
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 03/26/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 03/26/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 03/26/2026 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 04/01/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 04/01/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 04/01/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 04/01/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |