Permit: TR-UTL-0326-00531
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6756 S DOWNING AV
Address NEW:
6756 S DOWNING AV
Apply Date:
03/18/2026
Applicant:
Ilana Galluzzo
Description:
2' x 6' TRENCH IN DIRT/ASPHALT TO INSTALL NEW GAS SERVICE
Permit Reviews
Permit Number - TR-UTL-0326-00531
Permit Status: Complete
Permit Description: 2' x 6' TRENCH IN DIRT/ASPHALT TO INSTALL NEW GAS SERVICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/18/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/23/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0326-00531
Permit Status: Complete
Permit Description: 2' x 6' TRENCH IN DIRT/ASPHALT TO INSTALL NEW GAS SERVICE
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/23/2026 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 03/23/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0326-00531
Permit Description: 2' x 6' TRENCH IN DIRT/ASPHALT TO INSTALL NEW GAS SERVICE
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Job has been completed, all traffic controlled devices removed from site | |
| 06/23/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | no pre con meeting held, confirmed with ilana job has been completed | |
| 06/23/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | trench crossing is completed, T – top style restoration, and landscape backfill completed | |
| 06/23/2026 | TRSP - ROW - Final | Passed | asphalt restoration has been completed, traffic control devices have been removed from site, approved |