Permit: TR-UTL-0326-00518
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5655 S WHITE ROCK AV
Address NEW:
5655 S WHITE ROCK AV
Apply Date:
03/17/2026
Applicant:
Adrien Pineda
Description:
*90 DAYS* ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 30X3 TRENHC ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 5655 S WHITE ROCK AV
Permit Reviews
Permit Number - TR-UTL-0326-00518
Permit Status: Complete
Permit Description: *90 DAYS*
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 30X3 TRENHC ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 5655 S WHITE ROCK AV
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/23/2026 | RIGHT-OF-WAY REVIEW v.2 | 03/24/2026 | APPROVED |
| 03/18/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/19/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0326-00518
Permit Status: Complete
Permit Description: *90 DAYS*
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 30X3 TRENHC ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 5655 S WHITE ROCK AV
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 03/18/2026 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 03/18/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/24/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 03/24/2026 | Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0326-00518
Permit Description: *90 DAYS*
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 30X3 TRENHC ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 5655 S WHITE ROCK AV
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/31/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/23/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/23/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/23/2026 | TRSP - ROW - Final | Passed |