Permit Details

Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address:
300 S TOOLE AV
Address NEW:
300 S TOOLE AV
Apply Date:
03/12/2026
Applicant:
Aidan Willis
Description:
Zayo Contractor (ADB companies) to install conduit/fiber via directional bore and trench for an estimated 423 LF along City of Tucson ROW. Zayo Handholes to be installed along the east side of HWY 210 for future maintenance and access.

Permit Reviews

Permit Number - TR-UTL-0326-00511
Permit Status: In review
Permit Description: Zayo Contractor (ADB companies) to install conduit/fiber via directional bore and trench for an estimated 423 LF along City of Tucson ROW. Zayo Handholes to be installed along the east side of HWY 210 for future maintenance and access.
Start Date Submittal Complete Date Status  
03/12/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0326-00511
Permit Status: In review
Permit Description: Zayo Contractor (ADB companies) to install conduit/fiber via directional bore and trench for an estimated 423 LF along City of Tucson ROW. Zayo Handholes to be installed along the east side of HWY 210 for future maintenance and access.
Total Outstanding Activity Conditions - 6
Date Name
03/16/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
03/16/2026 ROW Permit is only allowed for work within City of Tucson Right of Way.
03/16/2026 Approved for Work within City of Tucson Right of Way Only. Pima Couty permits will be required for work in and Traffic Control within Pima ROW
03/16/2026 Traffic control set-up approved between 9AM - 3:30PM
03/16/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
03/16/2026 Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.