Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
8901 S WILMOT RD
Address NEW:
8901 S WILMOT RD
Apply Date:
03/11/2026
Applicant:
Esteban Vega - Desert Barricades
Description:
WOs T44585, T167254, T167856, T124483. TEP will install 23 new poles, 2 anchor/guys, 6,370’ of new overhead conductor, 580’ of 6” conduit and cable. 06/15/2026 - Request for 90 Day Renewal as of 06/25/2026

Permit Reviews

Permit Number - TR-UTL-0326-00501
Permit Status: Issued
Permit Description: WOs T44585, T167254, T167856, T124483. TEP will install 23 new poles, 2 anchor/guys, 6,370’ of new overhead conductor, 580’ of 6” conduit and cable. 06/15/2026 - Request for 90 Day Renewal as of 06/25/2026
Start Date Submittal Complete Date Status  
03/11/2026 RIGHT-OF-WAY REVIEW v.1 03/13/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0326-00501
Permit Status: Issued
Permit Description: WOs T44585, T167254, T167856, T124483. TEP will install 23 new poles, 2 anchor/guys, 6,370’ of new overhead conductor, 580’ of 6” conduit and cable. 06/15/2026 - Request for 90 Day Renewal as of 06/25/2026
Total Outstanding Activity Conditions - 4
Date Name
03/12/2026 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
03/12/2026 Traffic control set-up approved between 9AM - 3:30PM
03/13/2026 City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way
03/13/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Issued
Permit Number: TR-UTL-0326-00501
Permit Description: WOs T44585, T167254, T167856, T124483. TEP will install 23 new poles, 2 anchor/guys, 6,370’ of new overhead conductor, 580’ of 6” conduit and cable. 06/15/2026 - Request for 90 Day Renewal as of 06/25/2026
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/13/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed traffic control mobilizing tomorrow, TEP and driller will ensure all areas for pole installation fully in successfully marked for 811

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
DB 72240 - 8901 S WILMOT RD - NB SHOULDER CLOSURE - T44585-T167254-T167254-T124483_V1.PDF DOCUMENTS VIEW
PERMIT MAP WO T44585 T124483 T167254 T167856_V1.PDF DOCUMENTS VIEW