Permit: TR-UTL-0326-00491
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6475 E GOLF LINKS RD
Address NEW:
6475 E GOLF LINKS RD
Apply Date:
03/10/2026
Applicant:
Cox Communications
Description:
PRJ311474-1: Cox to overlash 646' of aerial strand & trench 11' to install new CATV conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0326-00491
Permit Status: Complete
Permit Description: PRJ311474-1: Cox to overlash 646' of aerial strand & trench 11' to install new CATV conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/11/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/13/2026 | REQUIRES RESUBMIT |
| 03/19/2026 | RIGHT-OF-WAY REVIEW v.2 | 03/26/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0326-00491
Permit Status: Complete
Permit Description: PRJ311474-1: Cox to overlash 646' of aerial strand & trench 11' to install new CATV conduit for system tie.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 03/12/2026 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. |
| 03/12/2026 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 03/12/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/13/2026 | HAWK crossing shall remain open at all times |
| 03/26/2026 | All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 03/26/2026 | Field Adjustment Authority Condition - The City reserves the right to modify or require adjustments to the traffic control plan in the field if conditions are determined to be unsafe or causing unnecessary traffic impacts. |
| 03/26/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0326-00491
Permit Description: PRJ311474-1: Cox to overlash 646' of aerial strand & trench 11' to install new CATV conduit for system tie.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/22/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | on site meeting with traffic control, utility, and aerial contractor, next inspection will be barricade set up Monday morning | |
| 08/03/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | all devices removed from site | |
| 08/03/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | alleyway landscape backfill has been completed | |
| 08/03/2026 | TRSP - ROW - Final | Passed | all previous inspections completed, site is clear of debris and devices, approved |