Permit: TR-UTL-0326-00475
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
3142 S MARVIN AV
Address NEW:
3142 S MARVIN AV
Apply Date:
03/09/2026
Applicant:
ANGEL MORALES
Description:
P.092819D BORE 1871' AND TRENCH 141' TO PLACE CONDUIT AND FIBER CABLE, PLACE 18 HANDHOLES/PEDESTALS
Permit Reviews
Permit Number - TR-UTL-0326-00475
Permit Status: Inspections
Permit Description: P.092819D
BORE 1871' AND TRENCH 141' TO PLACE CONDUIT AND FIBER CABLE, PLACE 18 HANDHOLES/PEDESTALS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/09/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/10/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0326-00475
Permit Status: Inspections
Permit Description: P.092819D
BORE 1871' AND TRENCH 141' TO PLACE CONDUIT AND FIBER CABLE, PLACE 18 HANDHOLES/PEDESTALS
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 03/09/2026 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 03/09/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/09/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 03/10/2026 | Bus Stop - Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 03/10/2026 | Excavation - All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 03/10/2026 | Survey Monument – If survey markers are damaged and/or disturbed during construction, the contractor shall have the marker reset by a registered Land Surveyor. According to state law (ARS 33-103) |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0326-00475
Permite Description: P.092819D
BORE 1871' AND TRENCH 141' TO PLACE CONDUIT AND FIBER CABLE, PLACE 18 HANDHOLES/PEDESTALS
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2026 | TRSP - ROW - Barricade - Setup/Routine | N/A | Not Ready | phone call with Skylar, job has not yet been assigned. Extension request has been submitted. |
| 06/24/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required | phone call with Skylar, job has not yet been assigned. Extension request has been submitted. |
| 06/24/2026 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Not Ready | phone call with Skylar, job has not yet been assigned. Extension request has been submitted. |
| 06/24/2026 | TRSP - ROW - Final | N/A | Not Ready | phone call with Skylar, job has not yet been assigned. Extension request has been submitted. |