Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address NEW:
601 W SANTA PAULA ST
Apply Date:
03/04/2026
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
**Continuation of Permit #TR-UTL-0825-01273**. Mission Manor Main Replacement Phase 1E - approx 3790LF of water main replacement with 41 service line replacements

Permit Reviews

Permit Number - TR-UTL-0326-00449
Permit Status: Inspections
Permit Description: **Continuation of Permit #TR-UTL-0825-01273**. Mission Manor Main Replacement Phase 1E - approx 3790LF of water main replacement with 41 service line replacements
Start Date Submittal Complete Date Status  
03/04/2026 RIGHT-OF-WAY REVIEW v.1 03/11/2026 REQUIRES RESUBMIT Review Details
04/09/2026 RIGHT-OF-WAY REVIEW v.2 07/22/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0326-00449
Permit Status: Inspections
Permit Description: **Continuation of Permit #TR-UTL-0825-01273**. Mission Manor Main Replacement Phase 1E - approx 3790LF of water main replacement with 41 service line replacements
Total Outstanding Activity Conditions - 6
Date Name
03/04/2026 The following extended traffic control set-up times were approved:
03/04/2026 – If survey markers are damaged and/or disturbed during construction, the contractor shall have the marker reset by a registered Land Surveyor. According to state law (ARS 33-103)
03/04/2026 All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
03/04/2026 BUS STOP/ ROUTE
03/04/2026 PRE-CON/SIDEWALK
04/20/2026 Continuous ADA-compliant pedestrian access shall be maintained at all times. If sidewalks are closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0326-00449
Permit Description: **Continuation of Permit #TR-UTL-0825-01273**. Mission Manor Main Replacement Phase 1E - approx 3790LF of water main replacement with 41 service line replacements
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/12/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
8 MISSION MANOR -8-MODEL_V2.PDF DOCUMENTS VIEW
13 MISSION MANOR -13-MODEL_V1.PDF DOCUMENTS VIEW
2 MISSION MANOR 12 TH AVE RLC TCP-2-MODEL REVISED_V1.PDF DOCUMENTS VIEW
3 MISSION MANOR PROJECT LLC 12TH AVE TCP-3-MODEL_V1.PDF DOCUMENTS VIEW
5 MISSION MANOR PROJECT SOFT CLOSURE PACHECO TCP 5-MODEL_V1.PDF DOCUMENTS VIEW
6 MISSION MANOR SANTA CLARA FOOTBALL TCP6-MODEL_V1.PDF DOCUMENTS VIEW
100 MISSION MANOR PH 1E ROE MARKUP PLANS_V1.PDF DOCUMENTS VIEW