Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
3352 N ALVERNON WY
Apply Date:
03/03/2026
Applicant:
Brittany West
Description:
Overlash 1325' of 48ct fiber over 10 spans. Overlash 330' of 48ct fiber over 2 spans. Place 145' of new strand, place 145' of 48ct fiber over 1 span. Riser down and place new vault at base of pole. Bore 320' of 2" conduit at a depth of 3', run 320' of 48ct fiber. Place new vault. Place 1120' of new strand, place 1120' of 48ct fiber over 9 span. Place new vault. Place 110' of new strand, place 110' of 48ct fiber over 1 span. Riser down and bore 600' of 2" conduit at a depth of 3', run 600' of 48ct fiber. Place 2 new vaults.

Permit Reviews

Permit Number - TR-UTL-0326-00437
Permit Status: Complete
Permit Description: Overlash 1325' of 48ct fiber over 10 spans. Overlash 330' of 48ct fiber over 2 spans. Place 145' of new strand, place 145' of 48ct fiber over 1 span. Riser down and place new vault at base of pole. Bore 320' of 2" conduit at a depth of 3', run 320' of 48ct fiber. Place new vault. Place 1120' of new strand, place 1120' of 48ct fiber over 9 span. Place new vault. Place 110' of new strand, place 110' of 48ct fiber over 1 span. Riser down and bore 600' of 2" conduit at a depth of 3', run 600' of 48ct fiber. Place 2 new vaults.
Start Date Submittal Complete Date Status  
03/03/2026 RIGHT-OF-WAY REVIEW v.1 03/09/2026 REQUIRES RESUBMIT Review Details
03/11/2026 RIGHT-OF-WAY REVIEW v.2 03/13/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0326-00437
Permit Status: Complete
Permit Description: Overlash 1325' of 48ct fiber over 10 spans. Overlash 330' of 48ct fiber over 2 spans. Place 145' of new strand, place 145' of 48ct fiber over 1 span. Riser down and place new vault at base of pole. Bore 320' of 2" conduit at a depth of 3', run 320' of 48ct fiber. Place new vault. Place 1120' of new strand, place 1120' of 48ct fiber over 9 span. Place new vault. Place 110' of new strand, place 110' of 48ct fiber over 1 span. Riser down and bore 600' of 2" conduit at a depth of 3', run 600' of 48ct fiber. Place 2 new vaults.
Total Outstanding Activity Conditions - 6
Date Name
03/06/2026 Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination.
03/06/2026 ROW Permit is only allowed for work within City of Tucson Right of Way.
03/06/2026 Approved for Work within City of Tucson Right of Way Only. Pima Couty permits will be required for work in and Traffic Control within Pima ROW
03/06/2026 Traffic control set-up approved between 9AM - 3:30PM
03/06/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
03/06/2026 UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0326-00437
Permit Description: Overlash 1325' of 48ct fiber over 10 spans. Overlash 330' of 48ct fiber over 2 spans. Place 145' of new strand, place 145' of 48ct fiber over 1 span. Riser down and place new vault at base of pole. Bore 320' of 2" conduit at a depth of 3', run 320' of 48ct fiber. Place new vault. Place 1120' of new strand, place 1120' of 48ct fiber over 9 span. Place new vault. Place 110' of new strand, place 110' of 48ct fiber over 1 span. Riser down and bore 600' of 2" conduit at a depth of 3', run 600' of 48ct fiber. Place 2 new vaults.
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/20/2026 TRSP - ROW - Barricade - Setup/Routine Passed
04/20/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
04/20/2026 TRSP - ROW - AERIAL INSTALLATION Passed
04/20/2026 TRSP - ROW - Final Passed