Permit: TR-UTL-0326-00434
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
670 W CONGRESS ST
Address NEW:
670 W CONGRESS ST
Apply Date:
03/03/2026
Applicant:
Kristine Schwartz
Description:
2 5x5 bellholes in dirt/blktop front for crews to install gas anodes on facilities SWG address- 602 W Congress St
Permit Reviews
Permit Number - TR-UTL-0326-00434
Permit Status: Inspections
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to install gas anodes on facilities
SWG address- 602 W Congress St
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/04/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/20/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0326-00434
Permit Status: Inspections
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to install gas anodes on facilities
SWG address- 602 W Congress St
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 03/05/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 03/05/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/06/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 03/06/2026 | Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 03/06/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 03/06/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 03/06/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0326-00434
Permite Description: 2 5x5 bellholes in dirt/blktop front for crews to install gas anodes on facilities
SWG address- 602 W Congress St
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2026 | TRSP - ROW - Final | N/A | Re-inspection required | Work completed they still need to do the concrete repair inspection |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0326-00434
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to install gas anodes on facilities
SWG address- 602 W Congress St
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | The work will be done in the dirt on the west side of the bridge | |
| 05/27/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work completed they still need to do the concrete repair inspection not needed | |
| 05/27/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work completed they still need to do the concrete repair | |
| 06/26/2026 | TRSP - ROW - Final | Passed | All concrete sidewalk repair has been completed for this permit |