Permit: TR-UTL-0326-00429
Permit Details
Status:
Inspections Complete
Type:
Right-of-Way (ROW) - Utility
Address:
10191 E LUCILLE DR
Address NEW:
10191 E LUCILLE DR
Apply Date:
03/03/2026
Applicant:
Description:
wo#3224922 10191 e lucille dr 14 15 26 ne renew service front of lot in asphalt 6LF/sc
Permit Reviews
Permit Number - TR-UTL-0326-00429
Permit Status: Inspections complete
Permit Description: wo#3224922 10191 e lucille dr 14 15 26 ne renew service front of lot in asphalt 6LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/03/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0326-00429
Permit Status: Inspections complete
Permit Description: wo#3224922 10191 e lucille dr 14 15 26 ne renew service front of lot in asphalt 6LF/sc
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/05/2026 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 03/05/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TR-UTL-0326-00429
Permit Description: wo#3224922 10191 e lucille dr 14 15 26 ne renew service front of lot in asphalt 6LF/sc
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | no traffic control devices on site, work has been done | |
| 05/08/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | no pre-con meeting held, work has been done | |
| 09/22/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | permanent patch is in place | |
| 09/22/2026 | TRSP - ROW - Final | Passed | permanent patch is in place, traffic control devices have been removed from site, approved |