Permit: TR-UTL-0325-00525
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
729 E 35TH ST
Address NEW:
729 E 35TH ST
Apply Date:
03/28/2025
Applicant:
Ilana Galluzzo
Description:
3' x 6' BELL HOLE IN DIRT WITH AN APPROX. 2' x 50' TRENCH IN PAVEMENT/DIRT TO INSTALL NEW GAS SERVICE
Permit Reviews
Permit Number - TR-UTL-0325-00525
Permit Status: Inspections
Permit Description: 3' x 6' BELL HOLE IN DIRT WITH AN APPROX. 2' x 50' TRENCH IN PAVEMENT/DIRT TO INSTALL NEW GAS SERVICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/31/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/02/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00525
Permit Status: Inspections
Permit Description: 3' x 6' BELL HOLE IN DIRT WITH AN APPROX. 2' x 50' TRENCH IN PAVEMENT/DIRT TO INSTALL NEW GAS SERVICE
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/01/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 04/01/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0325-00525
Permite Description: 3' x 6' BELL HOLE IN DIRT WITH AN APPROX. 2' x 50' TRENCH IN PAVEMENT/DIRT TO INSTALL NEW GAS SERVICE
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2025 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | |
| 06/03/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0325-00525
Permit Description: 3' x 6' BELL HOLE IN DIRT WITH AN APPROX. 2' x 50' TRENCH IN PAVEMENT/DIRT TO INSTALL NEW GAS SERVICE
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/08/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |