Permit: TR-UTL-0325-00516
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2326 E PRINCE RD
Address NEW:
2326 E PRINCE RD
Apply Date:
03/26/2025
Applicant:
Desert Barricades LLC
Description:
WO T143357 - TEP will be removing 1 pole in the ROW a 2'x2' hole 6' deep will be backfilled without sidewalk impact.
Permit Reviews
Permit Number - TR-UTL-0325-00516
Permit Status: Complete
Permit Description: WO T143357 - TEP will be removing 1 pole in the ROW a 2'x2' hole 6' deep will be backfilled without sidewalk impact.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/31/2025 | RIGHT-OF-WAY REVIEW v.2 | 04/02/2025 | APPROVED |
| 03/26/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/27/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00516
Permit Status: Complete
Permit Description: WO T143357 - TEP will be removing 1 pole in the ROW a 2'x2' hole 6' deep will be backfilled without sidewalk impact.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/27/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 03/27/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/02/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0325-00516
Permit Description: WO T143357 - TEP will be removing 1 pole in the ROW a 2'x2' hole 6' deep will be backfilled without sidewalk impact.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/06/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/06/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/06/2025 | TRSP - ROW - Final | Passed |