Permit: TR-UTL-0325-00509
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7073 E 22ND ST
Address NEW:
7073 E 22ND ST
Apply Date:
03/25/2025
Applicant:
Tucson Electric Power
Description:
WO T143559. TEP TO REPLACE BAD POLE. 05/23/2025 - REQUEST FOR 90 DAY EXTENSION AS OF 06/06/2025
Permit Reviews
Permit Number - TR-UTL-0325-00509
Permit Status: Complete
Permit Description: WO T143559. TEP TO REPLACE BAD POLE.
05/23/2025 - REQUEST FOR 90 DAY EXTENSION AS OF 06/06/2025
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/25/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/27/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00509
Permit Status: Complete
Permit Description: WO T143559. TEP TO REPLACE BAD POLE.
05/23/2025 - REQUEST FOR 90 DAY EXTENSION AS OF 06/06/2025
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/27/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 03/27/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0325-00509
Permit Description: WO T143559. TEP TO REPLACE BAD POLE.
05/23/2025 - REQUEST FOR 90 DAY EXTENSION AS OF 06/06/2025
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/30/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/29/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 08/29/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 08/29/2025 | TRSP - ROW - Final | Passed |