Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
10249 E GOLF LINKS RD
Apply Date:
03/25/2025
Applicant:
Desert Barricades LLC
Description:
WO T87972. Installation of two new poles and anchor to mitigate Houghton public improvement conflict.

Permit Reviews

Permit Number - TR-UTL-0325-00508
Permit Status: Complete
Permit Description: WO T87972. Installation of two new poles and anchor to mitigate Houghton public improvement conflict.
Start Date Submittal Complete Date Status  
03/25/2025 RIGHT-OF-WAY REVIEW v.1 03/27/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0325-00508
Permit Status: Complete
Permit Description: WO T87972. Installation of two new poles and anchor to mitigate Houghton public improvement conflict.
Total Outstanding Activity Conditions - 2
Date Name
03/27/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
03/27/2025 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0325-00508
Permit Description: WO T87972. Installation of two new poles and anchor to mitigate Houghton public improvement conflict.
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/26/2025 TRSP - ROW - Barricade - Setup/Routine Passed Work is complete, but no traffic control set up inspection was ever requested
06/26/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Work is complete, although no pre-activity meeting was ever requested
06/26/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete
06/26/2025 TRSP - ROW - Final Passed Work is complete