Permit: TR-UTL-0325-00507
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6500 S 6TH AV
Address NEW:
6500 S 6TH AV
Apply Date:
03/25/2025
Applicant:
Kristine Schwartz
Description:
2 5x5 bellholes in dirt/blktop front for crews to dig and inspect gas line
Permit Reviews
Permit Number - TR-UTL-0325-00507
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to dig and inspect gas line
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/25/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/02/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00507
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to dig and inspect gas line
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/28/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/28/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/01/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0325-00507
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to dig and inspect gas line
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/03/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/03/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 06/03/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 06/03/2025 | TRSP - ROW - Final | Passed |