Permit: TR-UTL-0325-00502
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7022 E SPEEDWAY BL
Address NEW:
7022 E SPEEDWAY BL
Apply Date:
03/24/2025
Applicant:
Cox Communications
Description:
PRJ290717-1: Cox to attach 143' new aerial and continue work on private property for system tie.
Permit Reviews
Permit Number - TR-UTL-0325-00502
Permit Status: Complete
Permit Description: PRJ290717-1: Cox to attach 143' new aerial and continue work on private property for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/25/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/01/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00502
Permit Status: Complete
Permit Description: PRJ290717-1: Cox to attach 143' new aerial and continue work on private property for system tie.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 03/28/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/01/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/01/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. |
| 04/01/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0325-00502
Permit Description: PRJ290717-1: Cox to attach 143' new aerial and continue work on private property for system tie.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/14/2025 | TRSP - ROW - Final | Passed | ||
| 05/14/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed |