Permit: TR-UTL-0325-00476
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4735 E 4TH ST
Address NEW:
4735 E 4TH ST
Apply Date:
03/20/2025
Applicant:
Description:
work order 2965327/2965333 4735 e 4th st 14 14 11, instal new 1" water services at the southside of address,6lf asphalt.ca
Permit Reviews
Permit Number - TR-UTL-0325-00476
Permit Status: Complete
Permit Description: work order 2965327/2965333
4735 e 4th st 14 14 11, instal new 1" water services at the southside of address,6lf asphalt.ca
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/23/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/25/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00476
Permit Status: Complete
Permit Description: work order 2965327/2965333
4735 e 4th st 14 14 11, instal new 1" water services at the southside of address,6lf asphalt.ca
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/24/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 03/24/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 03/25/2025 | Pavement Under Moratorium Conditions - as of Feb. 14, 2025 - Pavement to be restored to Moratorium Conditions at the direction of DTM Inspection team at the conclusion of work |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0325-00476
Permit Description: work order 2965327/2965333
4735 e 4th st 14 14 11, instal new 1" water services at the southside of address,6lf asphalt.ca
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/29/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/29/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 09/17/2025 | TRSP - ROW - Final | Passed |