Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3301 S 6TH AV
Address NEW:
3301 S 6TH AV
Apply Date:
03/19/2025
Applicant:
Cox Communications
Description:
PRJ273080-1: Cox to overlash 490' to existing strand, Pull 429' through existing conduit, trench 25' and bore 228' to install CATV conduit and place vaults for system tie. Permit update 6/25/2025: Renewal request for 90 days as of 7/8/2025.

Permit Reviews

Permit Number - TR-UTL-0325-00467
Permit Status: Complete
Permit Description: PRJ273080-1: Cox to overlash 490' to existing strand, Pull 429' through existing conduit, trench 25' and bore 228' to install CATV conduit and place vaults for system tie. Permit update 6/25/2025: Renewal request for 90 days as of 7/8/2025.
Start Date Submittal Complete Date Status  
03/21/2025 RIGHT-OF-WAY REVIEW v.1 03/21/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0325-00467
Permit Status: Complete
Permit Description: PRJ273080-1: Cox to overlash 490' to existing strand, Pull 429' through existing conduit, trench 25' and bore 228' to install CATV conduit and place vaults for system tie. Permit update 6/25/2025: Renewal request for 90 days as of 7/8/2025.
Total Outstanding Activity Conditions - 4
Date Name
03/21/2025 ROW Permit is only allowed for work within City of Tucson Right of Way.
03/21/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
03/21/2025 Traffic control set-up approved between 9AM - 3:30PM
03/21/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0325-00467
Permit Description: PRJ273080-1: Cox to overlash 490' to existing strand, Pull 429' through existing conduit, trench 25' and bore 228' to install CATV conduit and place vaults for system tie. Permit update 6/25/2025: Renewal request for 90 days as of 7/8/2025.
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/03/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/26/2025 TRSP - ROW - Barricade - Setup/Routine Passed
09/29/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
10/09/2025 TRSP - ROW - Final Passed