Permit: TR-UTL-0325-00467
Permit Details
Apply Date:
03/19/2025
Applicant:
Cox Communications
Description:
PRJ273080-1: Cox to overlash 490' to existing strand, Pull 429' through existing conduit, trench 25' and bore 228' to install CATV conduit and place vaults for system tie. Permit update 6/25/2025: Renewal request for 90 days as of 7/8/2025.
Permit Reviews
Permit Number - TR-UTL-0325-00467
Permit Status: Issued
Permit Description: PRJ273080-1: Cox to overlash 490' to existing strand, Pull 429' through existing conduit, trench 25' and bore 228' to install CATV conduit and place vaults for system tie.
Permit update 6/25/2025: Renewal request for 90 days as of 7/8/2025.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/21/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/21/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00467
Permit Status: Issued
Permit Description: PRJ273080-1: Cox to overlash 490' to existing strand, Pull 429' through existing conduit, trench 25' and bore 228' to install CATV conduit and place vaults for system tie.
Permit update 6/25/2025: Renewal request for 90 days as of 7/8/2025.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 03/21/2025 | ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 03/21/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 03/21/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/21/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0325-00467
Permit Description: PRJ273080-1: Cox to overlash 490' to existing strand, Pull 429' through existing conduit, trench 25' and bore 228' to install CATV conduit and place vaults for system tie.
Permit update 6/25/2025: Renewal request for 90 days as of 7/8/2025.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/26/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/29/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/09/2025 | TRSP - ROW - Final | Passed |