Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1100 N CALLE GARDENIAS
Apply Date:
03/19/2025
Applicant:
Ilana Galluzzo
Description:
(1) APPROX. 2' X 40' TRENCHING IN ASPHALT ON WEST SIDE OF N CALLE GARDENIAS, WITH ANOTHER APPROX 2' X 100' OF TRENCHING OFF THE EAST SIDE OF W CALLE DE DALIAS TO REPLACE GAS PIPE - CREWS WILL BE WORKING ALONG SPEEDWAY BLVD

Permit Reviews

Permit Number - TR-UTL-0325-00465
Permit Status: Complete
Permit Description: (1) APPROX. 2' X 40' TRENCHING IN ASPHALT ON WEST SIDE OF N CALLE GARDENIAS, WITH ANOTHER APPROX 2' X 100' OF TRENCHING OFF THE EAST SIDE OF W CALLE DE DALIAS TO REPLACE GAS PIPE - CREWS WILL BE WORKING ALONG SPEEDWAY BLVD
Start Date Submittal Complete Date Status  
03/21/2025 RIGHT-OF-WAY REVIEW v.1 03/21/2025 REQUIRES RESUBMIT Review Details
03/23/2025 RIGHT-OF-WAY REVIEW v.2 03/25/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0325-00465
Permit Status: Complete
Permit Description: (1) APPROX. 2' X 40' TRENCHING IN ASPHALT ON WEST SIDE OF N CALLE GARDENIAS, WITH ANOTHER APPROX 2' X 100' OF TRENCHING OFF THE EAST SIDE OF W CALLE DE DALIAS TO REPLACE GAS PIPE - CREWS WILL BE WORKING ALONG SPEEDWAY BLVD
Total Outstanding Activity Conditions - 2
Date Name
03/21/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
03/21/2025 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0325-00465
Permit Description: (1) APPROX. 2' X 40' TRENCHING IN ASPHALT ON WEST SIDE OF N CALLE GARDENIAS, WITH ANOTHER APPROX 2' X 100' OF TRENCHING OFF THE EAST SIDE OF W CALLE DE DALIAS TO REPLACE GAS PIPE - CREWS WILL BE WORKING ALONG SPEEDWAY BLVD
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/30/2025 TRSP - ROW - Barricade - Setup/Routine Passed
06/30/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/30/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
12/31/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
1100 N CALLE GARDENIAS TCP PLAN 1_V1.PDF DOCUMENTS VIEW
1100 N CALLE GARDENIAS TCP PLAN 2_V1.PDF DOCUMENTS VIEW
1100 N CALLE GARDENIAS 4977522_V1.PDF DOCUMENTS VIEW
1100 N CALLE GARDENIAS PLAN 1 REVISED_V2.PDF DOCUMENTS VIEW
1100 N CALLE GARDENIAS PLAN 2 REVISED_V2.PDF DOCUMENTS VIEW
36_4977522_V1.PDF DOCUMENTS VIEW