Permit: TR-UTL-0325-00465
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1100 N CALLE GARDENIAS
Address NEW:
1100 N CALLE GARDENIAS
Apply Date:
03/19/2025
Applicant:
Ilana Galluzzo
Description:
(1) APPROX. 2' X 40' TRENCHING IN ASPHALT ON WEST SIDE OF N CALLE GARDENIAS, WITH ANOTHER APPROX 2' X 100' OF TRENCHING OFF THE EAST SIDE OF W CALLE DE DALIAS TO REPLACE GAS PIPE - CREWS WILL BE WORKING ALONG SPEEDWAY BLVD
Permit Reviews
Permit Number - TR-UTL-0325-00465
Permit Status: Complete
Permit Description: (1) APPROX. 2' X 40' TRENCHING IN ASPHALT ON WEST SIDE OF N CALLE GARDENIAS, WITH ANOTHER APPROX 2' X 100' OF TRENCHING OFF THE EAST SIDE OF W CALLE DE DALIAS TO REPLACE GAS PIPE - CREWS WILL BE WORKING ALONG SPEEDWAY BLVD
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/21/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/21/2025 | REQUIRES RESUBMIT |
| 03/23/2025 | RIGHT-OF-WAY REVIEW v.2 | 03/25/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00465
Permit Status: Complete
Permit Description: (1) APPROX. 2' X 40' TRENCHING IN ASPHALT ON WEST SIDE OF N CALLE GARDENIAS, WITH ANOTHER APPROX 2' X 100' OF TRENCHING OFF THE EAST SIDE OF W CALLE DE DALIAS TO REPLACE GAS PIPE - CREWS WILL BE WORKING ALONG SPEEDWAY BLVD
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/21/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 03/21/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0325-00465
Permit Description: (1) APPROX. 2' X 40' TRENCHING IN ASPHALT ON WEST SIDE OF N CALLE GARDENIAS, WITH ANOTHER APPROX 2' X 100' OF TRENCHING OFF THE EAST SIDE OF W CALLE DE DALIAS TO REPLACE GAS PIPE - CREWS WILL BE WORKING ALONG SPEEDWAY BLVD
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/30/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/30/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/31/2025 | TRSP - ROW - Final | Passed |