Permit: TR-UTL-0325-00453
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2802 E OHIO ST
Address NEW:
2802 E OHIO ST
Apply Date:
03/18/2025
Applicant:
Tucson Electric Power
Description:
WO T132515 - TEP CREWS TO PARK IN THE CITY OF TUCSON RIGHT-OF-WAY TO PERFORM OVERHEAD WORK ON THE NORTH SIDE OF OHIO STREET, TO REPLACE POLE IN LINE WITH EXISITING POWER LINE. 05/20/2025 "REQUEST FOR 60 DAY EXTENSION AS OF 05/30/2025"
Permit Reviews
Permit Number - TR-UTL-0325-00453
Permit Status: Complete
Permit Description: WO T132515 - TEP CREWS TO PARK IN THE CITY OF TUCSON RIGHT-OF-WAY TO PERFORM OVERHEAD WORK ON THE NORTH SIDE OF OHIO STREET, TO REPLACE POLE IN LINE WITH EXISITING POWER LINE.
05/20/2025 "REQUEST FOR 60 DAY EXTENSION AS OF 05/30/2025"
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/19/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/19/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00453
Permit Status: Complete
Permit Description: WO T132515 - TEP CREWS TO PARK IN THE CITY OF TUCSON RIGHT-OF-WAY TO PERFORM OVERHEAD WORK ON THE NORTH SIDE OF OHIO STREET, TO REPLACE POLE IN LINE WITH EXISITING POWER LINE.
05/20/2025 "REQUEST FOR 60 DAY EXTENSION AS OF 05/30/2025"
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/19/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 03/19/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0325-00453
Permit Description: WO T132515 - TEP CREWS TO PARK IN THE CITY OF TUCSON RIGHT-OF-WAY TO PERFORM OVERHEAD WORK ON THE NORTH SIDE OF OHIO STREET, TO REPLACE POLE IN LINE WITH EXISITING POWER LINE.
05/20/2025 "REQUEST FOR 60 DAY EXTENSION AS OF 05/30/2025"
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/23/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/28/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/28/2025 | TRSP - ROW - Final | Passed |