Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
6161 E GRANT RD BLDG 1
Apply Date:
03/17/2025
Applicant:
Cox Communications
Description:
PRJ288005-1-Cox to remove & replace 4 vault locations, (1 on private property), Intercept existing structures, trench total 14ft, and bore total 503ft, & riser down pole.

Permit Reviews

Permit Number - TR-UTL-0325-00443
Permit Status: Complete
Permit Description: PRJ288005-1-Cox to remove & replace 4 vault locations, (1 on private property), Intercept existing structures, trench total 14ft, and bore total 503ft, & riser down pole.
Start Date Submittal Complete Date Status  
03/17/2025 RIGHT-OF-WAY REVIEW v.1 03/20/2025 REQUIRES RESUBMIT Review Details
03/27/2025 RIGHT-OF-WAY REVIEW v.2 03/31/2025 REQUIRES RESUBMIT Review Details
04/01/2025 RIGHT-OF-WAY REVIEW v.3 04/02/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0325-00443
Permit Status: Complete
Permit Description: PRJ288005-1-Cox to remove & replace 4 vault locations, (1 on private property), Intercept existing structures, trench total 14ft, and bore total 503ft, & riser down pole.
Total Outstanding Activity Conditions - 5
Date Name
03/20/2025 Traffic control set-up approved between 9AM - 3:30PM
03/20/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
03/20/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
04/02/2025 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE.
04/02/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0325-00443
Permit Description: PRJ288005-1-Cox to remove & replace 4 vault locations, (1 on private property), Intercept existing structures, trench total 14ft, and bore total 503ft, & riser down pole.
Total Completed Inspections - 5
Date Description Inspector Results Comments
04/16/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/13/2025 TRSP - ROW - Barricade - Setup/Routine Passed
05/13/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
05/28/2025 TRSP - ROW - Barricade Takedown Passed
06/03/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
PO-122388_PRJ288005-1_E GRANT RD - N WILMOT RD_TCP_REV 2_V1.PDF DOCUMENTS VIEW
PRJ288005-1 TUCSON PLANS_V1.PDF DOCUMENTS VIEW