Permit: TR-UTL-0325-00419
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3790 S CINDY LN
Address NEW:
3790 S CINDY LN
Apply Date:
03/11/2025
Applicant:
luis granillo
Description:
wo2985471 3790 s cindy ln 14-15-26 sw replace hydrant south side of lot in dirt shoulder 4LF/sc
Permit Reviews
Permit Number - TR-UTL-0325-00419
Permit Status: Complete
Permit Description: wo2985471 3790 s cindy ln 14-15-26 sw replace hydrant south side of lot in dirt shoulder 4LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/12/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/14/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00419
Permit Status: Complete
Permit Description: wo2985471 3790 s cindy ln 14-15-26 sw replace hydrant south side of lot in dirt shoulder 4LF/sc
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/14/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 03/14/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0325-00419
Permit Description: wo2985471 3790 s cindy ln 14-15-26 sw replace hydrant south side of lot in dirt shoulder 4LF/sc
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/11/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is complete, but a barricade/traffic control set up inspection was never requested. | |
| 04/11/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Work is complete, but a pre-activity/pre-con meeting was never requested. | |
| 04/11/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete, but no backfill/compaction inspection was ever requested. | |
| 04/11/2025 | TRSP - ROW - Final | Passed | Work is complete. |