Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
8320 E CAMBRIA DR
Apply Date:
03/11/2025
Applicant:
luis granillo
Description:
wo#2949809 8320 e cambria dr 14-15-28 sw replace hydrant front north side of lot in dirt between sidewalk and curb 4LF/sc

Permit Reviews

Permit Number - TR-UTL-0325-00418
Permit Status: Complete
Permit Description: wo#2949809 8320 e cambria dr 14-15-28 sw replace hydrant front north side of lot in dirt between sidewalk and curb 4LF/sc
Start Date Submittal Complete Date Status  
03/12/2025 RIGHT-OF-WAY REVIEW v.1 03/13/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0325-00418
Permit Status: Complete
Permit Description: wo#2949809 8320 e cambria dr 14-15-28 sw replace hydrant front north side of lot in dirt between sidewalk and curb 4LF/sc
Total Outstanding Activity Conditions - 2
Date Name
03/13/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
03/13/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0325-00418
Permit Description: wo#2949809 8320 e cambria dr 14-15-28 sw replace hydrant front north side of lot in dirt between sidewalk and curb 4LF/sc
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/25/2025 TRSP - ROW - Barricade - Setup/Routine Passed Work is already complete and no traffic control setup inspection was ever requested
04/25/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Work is complete but no pre-activity meeting was ever requested
04/25/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete but no backfill inspection was ever requested
04/25/2025 TRSP - ROW - Final Passed Work is complete