Permit: TR-UTL-0325-00417
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
283 W MCFAR DR
Address NEW:
283 W MCFAR DR
Apply Date:
03/11/2025
Applicant:
Rene Villalobos
Description:
wo2980359 283 w mcfar dr 13-13-36 sw replace service front north side of lot in asphalt 5LF/sc
Permit Reviews
Permit Number - TR-UTL-0325-00417
Permit Status: Complete
Permit Description: wo2980359 283 w mcfar dr 13-13-36 sw replace service front north side of lot in asphalt 5LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/12/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/17/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00417
Permit Status: Complete
Permit Description: wo2980359 283 w mcfar dr 13-13-36 sw replace service front north side of lot in asphalt 5LF/sc
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 03/17/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 03/17/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 03/17/2025 | Proposed work area falls within Right of Way that is under Pavement Moratorium status as for Jan 2024. Proposed work will required pavement to be restored to Moratorium conditions at the conclusion of work. Per direction of ROW inspector at the time of Final inspection. |
| 03/17/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0325-00417
Permit Description: wo2980359 283 w mcfar dr 13-13-36 sw replace service front north side of lot in asphalt 5LF/sc
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/17/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/17/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 04/17/2025 | TRSP - ROW - Final | Passed |