Permit: TR-UTL-0325-00403
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
9766 E NICARAGUA PL
Address NEW:
9766 E NICARAGUA PL
Apply Date:
03/11/2025
Applicant:
luis granillo
Description:
wo#2993661 9766 e nicaragua pl 14-15-26 sw replace dva front north side of lot in asphalt 4LF/sc
Permit Reviews
Permit Number - TR-UTL-0325-00403
Permit Status: Complete
Permit Description: wo#2993661 9766 e nicaragua pl 14-15-26 sw replace dva front north side of lot in asphalt 4LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/11/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/13/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00403
Permit Status: Complete
Permit Description: wo#2993661 9766 e nicaragua pl 14-15-26 sw replace dva front north side of lot in asphalt 4LF/sc
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/13/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 03/13/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0325-00403
Permite Description: wo#2993661 9766 e nicaragua pl 14-15-26 sw replace dva front north side of lot in asphalt 4LF/sc
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2025 | TRSP - ROW - Final | N/A | Re-inspection required | Final pavement repair has not been completed |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0325-00403
Permit Description: wo#2993661 9766 e nicaragua pl 14-15-26 sw replace dva front north side of lot in asphalt 4LF/sc
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is complete. Final pavement repair is still required. Traffic control set up inspection was never requested. | |
| 04/29/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | No precon was requested. Work appears to be done but water around the meter suggests a leak may still be present | |
| 04/29/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work appears to be complete, there is a temporary patch in place. Therefore, a backfill inspection cannot be completed. | |
| 04/21/2026 | TRSP - ROW - Final | Passed | Area has been recently resurfaced through prop 411 |