Permit: TR-UTL-0325-00402
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2103 E 19TH ST
Address NEW:
2103 E 19TH ST
Apply Date:
03/11/2025
Applicant:
Description:
wo2977395 2103 e 19th st 14-14-17 sw replace valve front north side of lot in asphalt 6LF/sc
Permit Reviews
Permit Number - TR-UTL-0325-00402
Permit Status: Complete
Permit Description: wo2977395 2103 e 19th st 14-14-17 sw replace valve front north side of lot in asphalt 6LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/11/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/17/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00402
Permit Status: Complete
Permit Description: wo2977395 2103 e 19th st 14-14-17 sw replace valve front north side of lot in asphalt 6LF/sc
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/17/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 03/17/2025 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0325-00402
Permite Description: wo2977395 2103 e 19th st 14-14-17 sw replace valve front north side of lot in asphalt 6LF/sc
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Re-inspection required | |
| 05/07/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0325-00402
Permit Description: wo2977395 2103 e 19th st 14-14-17 sw replace valve front north side of lot in asphalt 6LF/sc
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/16/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 10/16/2025 | TRSP - ROW - Final | Passed |