Permit: TR-UTL-0325-00395
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
801 N GRANDE AV
Address NEW:
801 N GRANDE AV
Apply Date:
03/11/2025
Applicant:
Description:
5X5 BELL HOLE IN CONCRETE / ASPHALT TO DO A STREET CROSSING ON GRANDE. (815 N GRANDE AVE) TO REPLACE GAS LINE.
Permit Reviews
Permit Number - TR-UTL-0325-00395
Permit Status: Complete
Permit Description: 5X5 BELL HOLE IN CONCRETE / ASPHALT TO DO A STREET CROSSING ON GRANDE. (815 N GRANDE AVE) TO REPLACE GAS LINE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/11/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/17/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00395
Permit Status: Complete
Permit Description: 5X5 BELL HOLE IN CONCRETE / ASPHALT TO DO A STREET CROSSING ON GRANDE. (815 N GRANDE AVE) TO REPLACE GAS LINE.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 03/12/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/12/2025 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 03/12/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. |
| 03/12/2025 | Pre-Activity Meeting Pre-activity meeting to be held 72 hours in advance of work start with inspections. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0325-00395
Permit Description: 5X5 BELL HOLE IN CONCRETE / ASPHALT TO DO A STREET CROSSING ON GRANDE. (815 N GRANDE AVE) TO REPLACE GAS LINE.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/28/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/28/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 04/28/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 12/05/2025 | TRSP - ROW - Final | Passed |