Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0325-00388
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
428 S OLSEN AV
Address NEW:
428 S OLSEN AV
Apply Date:
03/10/2025
Applicant:
JUAN PEREZ
Description:
Excavating a 16x3 trench to replace gas line service in row in asphalt and dirt. Also pot hole a 3x3 to abandon gas line
Permit Reviews
Permit Number - TR-UTL-0325-00388
Permit Status: Inspections
Permit Description: Excavating a 16x3 trench to replace gas line service in row in asphalt and dirt. Also pot hole a 3x3 to abandon gas line
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/10/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/11/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00388
Permit Status: Inspections
Permit Description: Excavating a 16x3 trench to replace gas line service in row in asphalt and dirt. Also pot hole a 3x3 to abandon gas line
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/10/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 03/10/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0325-00388
Permit Description: Excavating a 16x3 trench to replace gas line service in row in asphalt and dirt. Also pot hole a 3x3 to abandon gas line
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/21/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/21/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 05/21/2025 | TRSP - ROW - Final | Passed |