Permit: TR-UTL-0325-00366
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
100 N STONE AV
Address NEW:
100 N STONE AV
Apply Date:
03/04/2025
Applicant:
Desert Barricades LLC
Description:
WO T90708 - VAULT 30 - 32°13'20.90", -110°58'16.71" (100 N. Stone) Underground vault maintenance - close lane for truck parking. - ( Updated Work to be performed on 3/16/2025 - 7 am to 3pm)
Permit Reviews
Permit Number - TR-UTL-0325-00366
Permit Status: Complete
Permit Description: WO T90708 - VAULT 30 - 32°13'20.90", -110°58'16.71" (100 N. Stone) Underground vault maintenance - close lane for truck parking. - ( Updated Work to be performed on 3/16/2025 - 7 am to 3pm)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/07/2025 | RIGHT-OF-WAY REVIEW v.2 | 03/10/2025 | APPROVED |
| 03/04/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/07/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0325-00366
Permit Status: Complete
Permit Description: WO T90708 - VAULT 30 - 32°13'20.90", -110°58'16.71" (100 N. Stone) Underground vault maintenance - close lane for truck parking. - ( Updated Work to be performed on 3/16/2025 - 7 am to 3pm)
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/05/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. . |
| 03/10/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0325-00366
Permit Description: WO T90708 - VAULT 30 - 32°13'20.90", -110°58'16.71" (100 N. Stone) Underground vault maintenance - close lane for truck parking. - ( Updated Work to be performed on 3/16/2025 - 7 am to 3pm)
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/07/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/07/2025 | TRSP - ROW - Final | Passed |