Permit: TR-UTL-0324-00666
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
9119 E 33RD PL
Address NEW:
9119 E 33RD PL
Apply Date:
03/29/2024
Applicant:
eligio pena
Description:
5x5 bell hole in asphalt to replace gas line. street crossing on 33rd pl
Permit Reviews
Permit Number - TR-UTL-0324-00666
Permit Status: Complete
Permit Description: 5x5 bell hole in asphalt to replace gas line. street crossing on 33rd pl
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/01/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/10/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0324-00666
Permit Status: Complete
Permit Description: 5x5 bell hole in asphalt to replace gas line. street crossing on 33rd pl
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/01/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 04/01/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00666
Permite Description: 5x5 bell hole in asphalt to replace gas line. street crossing on 33rd pl
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2024 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | site not completed |
| 06/10/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Re-inspection required | restoration needed |
| 06/10/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | restoration needed |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00666
Permit Description: 5x5 bell hole in asphalt to replace gas line. street crossing on 33rd pl
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/11/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/10/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/22/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 01/28/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | This is an old permit that has already passed the final inspection, the barricade takedown inspection, and the preconstruction inspection. The barricade set up inspection is not needed. | |
| 01/28/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | this permit has already expired, and it has already passed its final inspection. This paving inspection was just to finalize the permit and let it be closed. | |
| 01/28/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | This is an old permit that has already passed the final inspection, the barricade takedown inspection, and the preconstruction inspection. The backfill/compaction inspection is not needed. |