Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0324-00662
Permit Details
Apply Date:
03/29/2024
Applicant:
Cox Communications
Description:
Cox to pull 262' slack from ped to lockbox on the side of 4600 s park av
Permit Reviews
Permit Number - TR-UTL-0324-00662
Permit Status: Complete
Permit Description: Cox to pull 262' slack from ped to lockbox on the side of 4600 s park av
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/01/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/08/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0324-00662
Permit Status: Complete
Permit Description: Cox to pull 262' slack from ped to lockbox on the side of 4600 s park av
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
04/02/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
04/02/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00662
Permite Description: Cox to pull 262' slack from ped to lockbox on the side of 4600 s park av
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/23/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required | |
05/30/2024 | TRSP - ROW - Barricade - Setup/Routine | N/A | Partial Pass |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00662
Permit Description: Cox to pull 262' slack from ped to lockbox on the side of 4600 s park av
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/06/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
05/16/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
06/04/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
06/10/2024 | TRSP - ROW - Final/Close-Out | Passed |