Permit: TR-UTL-0324-00659
Permit Details
Apply Date:
03/29/2024
Applicant:
eligio pena
Description:
5x5 bell hole in asphalt. street crossing on alderpoint way to replace gas line.
Permit Reviews
Permit Number - TR-UTL-0324-00659
Permit Status: Issued
Permit Description: 5x5 bell hole in asphalt. street crossing on alderpoint way to replace gas line.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/01/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0324-00659
Permit Status: Issued
Permit Description: 5x5 bell hole in asphalt. street crossing on alderpoint way to replace gas line.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
04/01/2024 | Traffic Control set-up approved between 7AM - 5PM |
04/01/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
04/01/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-UTL-0324-00659
Permite Description: 5x5 bell hole in asphalt. street crossing on alderpoint way to replace gas line.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/13/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Re-inspection required |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0324-00659
Permit Description: 5x5 bell hole in asphalt. street crossing on alderpoint way to replace gas line.
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/09/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
05/13/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
05/15/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
05/13/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
06/12/2024 | TRSP - ROW - Final/Close-Out | Passed |