Permit: TR-UTL-0324-00648
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2207 N COLUMBUS BL
Address NEW:
2207 N COLUMBUS BL
Apply Date:
03/28/2024
Applicant:
National Barricade LLC.
Description:
EXCAVATING A 10X5 TRENCH AT 2207 N COLUMBUS BLVD TO REPLACE GAS SERVICE IN ROW IN ASPHALT, CONCRETE AND DIRT. TRENCH WILL BE LOCATED APPROX 10' EAST OF EAST P/L AND 5' NORTH OF SOUTH P/L
Permit Reviews
Permit Number - TR-UTL-0324-00648
Permit Status: Complete
Permit Description: EXCAVATING A 10X5 TRENCH AT 2207 N COLUMBUS BLVD TO REPLACE GAS SERVICE IN ROW IN ASPHALT, CONCRETE AND DIRT. TRENCH WILL BE LOCATED APPROX 10' EAST OF EAST P/L AND 5' NORTH OF SOUTH P/L
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/28/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0324-00648
Permit Status: Complete
Permit Description: EXCAVATING A 10X5 TRENCH AT 2207 N COLUMBUS BLVD TO REPLACE GAS SERVICE IN ROW IN ASPHALT, CONCRETE AND DIRT. TRENCH WILL BE LOCATED APPROX 10' EAST OF EAST P/L AND 5' NORTH OF SOUTH P/L
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/28/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/28/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00648
Permit Description: EXCAVATING A 10X5 TRENCH AT 2207 N COLUMBUS BLVD TO REPLACE GAS SERVICE IN ROW IN ASPHALT, CONCRETE AND DIRT. TRENCH WILL BE LOCATED APPROX 10' EAST OF EAST P/L AND 5' NORTH OF SOUTH P/L
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/08/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 05/08/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 05/08/2024 | TRSP - ROW - Notice of Completion | Passed | ||
| 05/08/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 05/08/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed |