Permit: TR-UTL-0324-00647
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
750 N GRANDE AV
Address NEW:
750 N GRANDE AV
Apply Date:
03/28/2024
Applicant:
Carla Donaldson
Description:
EXCAVATING A 3X3 BELL HOLE AT 750 N GRANDE AVE TO ADANDON GAS SERVICE IN ROW IN SIDEWALK AND DIRT, HOLE WILL BE APPRX 20 FEET SOUTH OF NORTH P/L AND 5 FEET WEST OF WEST P/L
Permit Reviews
Permit Number - TR-UTL-0324-00647
Permit Status: Complete
Permit Description: EXCAVATING A 3X3 BELL HOLE AT 750 N GRANDE AVE TO ADANDON GAS SERVICE IN ROW IN SIDEWALK AND DIRT, HOLE WILL BE APPRX 20 FEET SOUTH OF NORTH P/L AND 5 FEET WEST OF WEST P/L
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/28/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0324-00647
Permit Status: Complete
Permit Description: EXCAVATING A 3X3 BELL HOLE AT 750 N GRANDE AVE TO ADANDON GAS SERVICE IN ROW IN SIDEWALK AND DIRT, HOLE WILL BE APPRX 20 FEET SOUTH OF NORTH P/L AND 5 FEET WEST OF WEST P/L
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/28/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/28/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00647
Permit Description: EXCAVATING A 3X3 BELL HOLE AT 750 N GRANDE AVE TO ADANDON GAS SERVICE IN ROW IN SIDEWALK AND DIRT, HOLE WILL BE APPRX 20 FEET SOUTH OF NORTH P/L AND 5 FEET WEST OF WEST P/L
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/08/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 05/08/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/08/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 05/08/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 05/08/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 05/08/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 05/08/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed |