Permit: TR-UTL-0324-00644
Permit Details
Apply Date:
03/28/2024
Applicant:
Tucson Electric Power
Description:
WO T105496 - Replace pole, replace overhead transformer, install new overhead transformer and replace overhead secondary wire.
Permit Reviews
Permit Number - TR-UTL-0324-00644
Permit Status: Complete
Permit Description: WO T105496 - Replace pole, replace overhead transformer, install new overhead transformer and replace overhead secondary wire.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/28/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/28/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0324-00644
Permit Status: Complete
Permit Description: WO T105496 - Replace pole, replace overhead transformer, install new overhead transformer and replace overhead secondary wire.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
03/28/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
03/28/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00644
Permite Description: WO T105496 - Replace pole, replace overhead transformer, install new overhead transformer and replace overhead secondary wire.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/10/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00644
Permit Description: WO T105496 - Replace pole, replace overhead transformer, install new overhead transformer and replace overhead secondary wire.
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/10/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
06/10/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
06/10/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
06/10/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
06/10/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed |