Permit: TR-UTL-0324-00638
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2828 E PRESIDIO RD
Address NEW:
2828 E PRESIDIO RD
Apply Date:
03/27/2024
Applicant:
Description:
wo#2742036 2828 e presidio rd 13-14-32 ne valve replacement northwest side of lot in asphalt 6LF/sc
Permit Reviews
Permit Number - TR-UTL-0324-00638
Permit Status: Complete
Permit Description: wo#2742036 2828 e presidio rd 13-14-32 ne valve replacement northwest side of lot in asphalt 6LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/27/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/27/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0324-00638
Permit Status: Complete
Permit Description: wo#2742036 2828 e presidio rd 13-14-32 ne valve replacement northwest side of lot in asphalt 6LF/sc
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/27/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 03/27/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 03/27/2024 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00638
Permite Description: wo#2742036 2828 e presidio rd 13-14-32 ne valve replacement northwest side of lot in asphalt 6LF/sc
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00638
Permit Description: wo#2742036 2828 e presidio rd 13-14-32 ne valve replacement northwest side of lot in asphalt 6LF/sc
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/08/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/20/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 08/20/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 08/20/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 08/20/2025 | TRSP - ROW - Notice of Completion | Passed |