Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0324-00585
Permit Details
Apply Date:
03/22/2024
Applicant:
Tucson Water
Description:
2757252 2642 W ARTHUR PL 14-13-28NW Install new service front south of lot in asphalt and dirt easement:4lf asphalt; mlm
Permit Reviews
Permit Number - TR-UTL-0324-00585
Permit Status: Complete
Permit Description: 2757252 2642 W ARTHUR PL 14-13-28NW Install new service front south of lot in asphalt and dirt easement:4lf asphalt; mlm
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/22/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/22/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0324-00585
Permit Status: Complete
Permit Description: 2757252 2642 W ARTHUR PL 14-13-28NW Install new service front south of lot in asphalt and dirt easement:4lf asphalt; mlm
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
03/22/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
03/22/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00585
Permit Description: 2757252 2642 W ARTHUR PL 14-13-28NW Install new service front south of lot in asphalt and dirt easement:4lf asphalt; mlm
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/09/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
05/09/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
05/09/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
05/09/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
05/09/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
05/09/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
08/07/2024 | TRSP - ROW - SITE INSPECTION | Passed |