Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
5445 E 29TH ST
Address NEW:
5445 E 29TH ST
Apply Date:
03/21/2024
Applicant:
Bobby Akhter
Description:
From 5445 E 29th St to NW corner of E 29th St & S Craycroft Rd. Bore 448' of 3-1.25" conduits, place 2 TCA hand holes to access aerial cable, Pull fiber. Updated 5/21/2024 - Renewal Request for 30 days as of 5/16/2024

Permit Reviews

Permit Number - TR-UTL-0324-00560
Permit Status: Inspections
Permit Description: From 5445 E 29th St to NW corner of E 29th St & S Craycroft Rd. Bore 448' of 3-1.25" conduits, place 2 TCA hand holes to access aerial cable, Pull fiber. Updated 5/21/2024 - Renewal Request for 30 days as of 5/16/2024
Start Date Submittal Complete Date Status  
04/11/2024 RIGHT-OF-WAY REVIEW v.2 04/11/2024 APPROVED Review Details
03/21/2024 RIGHT-OF-WAY REVIEW v.1 03/21/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0324-00560
Permit Status: Inspections
Permit Description: From 5445 E 29th St to NW corner of E 29th St & S Craycroft Rd. Bore 448' of 3-1.25" conduits, place 2 TCA hand holes to access aerial cable, Pull fiber. Updated 5/21/2024 - Renewal Request for 30 days as of 5/16/2024
Total Outstanding Activity Conditions - 2
Date Name
03/21/2024 Bus stop/ route
03/21/2024 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0324-00560
Permit Description: From 5445 E 29th St to NW corner of E 29th St & S Craycroft Rd. Bore 448' of 3-1.25" conduits, place 2 TCA hand holes to access aerial cable, Pull fiber. Updated 5/21/2024 - Renewal Request for 30 days as of 5/16/2024
Total Completed Inspections - 5
Date Description Inspector Results Comments
05/23/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
08/15/2024 TRSP - ROW - Backfill - Placement/Compaction Passed all potholes and vaults inspected and backfill accepted
08/14/2024 TRSP - ROW - Barricade - Setup/Routine Passed
08/15/2024 TRSP - ROW - Barricade Takedown Passed All traffic control elements removed
03/04/2025 TRSP - ROW - Final/Close-Out Passed Work is complete area is restored

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P125031 5445 E 29TH ST (3_7_24)_V1.PDF DOCUMENTS VIEW
SITE LOCATION TCA P125031_V1.PDF DOCUMENTS VIEW
TCP P125031_5445 E 29TH ST (3_20_24)_V1.PDF DOCUMENTS VIEW