Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0324-00540
Permit Details
Apply Date:
03/20/2024
Applicant:
BeaJaye Laprath
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVTAE (2) 5X5 BELLHOLESALONG WITH (1) 25X3 TREANCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE AT 1115 S DESERT SENNA LOOP
Permit Reviews
Permit Number - TR-UTL-0324-00540
Permit Status: Issued
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVTAE (2) 5X5 BELLHOLESALONG WITH (1) 25X3 TREANCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE AT 1115 S DESERT SENNA LOOP
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/20/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/20/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0324-00540
Permit Status: Issued
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVTAE (2) 5X5 BELLHOLESALONG WITH (1) 25X3 TREANCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE AT 1115 S DESERT SENNA LOOP
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
03/20/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-UTL-0324-00540
Permite Description: ARIZONA PIPELINE WILL NEED TO EXCAVTAE (2) 5X5 BELLHOLESALONG WITH (1) 25X3 TREANCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE AT 1115 S DESERT SENNA LOOP
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/22/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Re-inspection required | |
08/21/2024 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0324-00540
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVTAE (2) 5X5 BELLHOLESALONG WITH (1) 25X3 TREANCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE AT 1115 S DESERT SENNA LOOP
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/03/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
05/22/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
05/22/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
05/22/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed |