Permit: TR-UTL-0324-00536
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
80 S CARLTON PARK PL
Address NEW:
80 S CARLTON PARK PL
Apply Date:
03/20/2024
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE (2) BELLHOLES IN ORDER TO REPLACE GAS SERVICE AT 80 S CARLTON PARK PL
Permit Reviews
Permit Number - TR-UTL-0324-00536
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (2) BELLHOLES IN ORDER TO REPLACE GAS SERVICE AT 80 S CARLTON PARK PL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/20/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/22/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0324-00536
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (2) BELLHOLES IN ORDER TO REPLACE GAS SERVICE AT 80 S CARLTON PARK PL
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/20/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 03/20/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00536
Permite Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (2) BELLHOLES IN ORDER TO REPLACE GAS SERVICE AT 80 S CARLTON PARK PL
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/28/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | |
| 05/28/2024 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | |
| 05/28/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00536
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (2) BELLHOLES IN ORDER TO REPLACE GAS SERVICE AT 80 S CARLTON PARK PL
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/28/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 06/12/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 04/17/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 05/08/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/08/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed |