Permit: TR-UTL-0324-00535
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
921 N WESTERN RIDGE TR
Address NEW:
921 N WESTERN RIDGE TR
Apply Date:
03/20/2024
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE (2) 5X5 BELLHOLES ALONG WITH (1) 25X3 TRENCH IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE AT 921 N WESTERN RIDGE TRL
Permit Reviews
Permit Number - TR-UTL-0324-00535
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (2) 5X5 BELLHOLES ALONG WITH (1) 25X3 TRENCH IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE AT 921 N WESTERN RIDGE TRL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/20/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/20/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0324-00535
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (2) 5X5 BELLHOLES ALONG WITH (1) 25X3 TRENCH IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE AT 921 N WESTERN RIDGE TRL
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/20/2024 | Wash |
| 03/20/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00535
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (2) 5X5 BELLHOLES ALONG WITH (1) 25X3 TRENCH IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE AT 921 N WESTERN RIDGE TRL
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/09/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/09/2024 | TRSP - ROW - SWBMP | Passed | ||
| 04/09/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 05/22/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 05/22/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 05/22/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 05/22/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed |