Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0324-00529
Permit Details
Apply Date:
03/19/2024
Applicant:
Robert Reynolds
Description:
New Business project off Valencia Rd and Frost Dr for new development. The trench has been provided by the developer for most of the project- Southwest gas is just extending the gas line for 524' in dirt, east of the proposed driveway to accommodate future development.
Permit Reviews
Permit Number - TR-UTL-0324-00529
Permit Status: Complete
Permit Description: New Business project off Valencia Rd and Frost Dr for new development. The trench has been provided by the developer for most of the project- Southwest gas is just extending the gas line for 524' in dirt, east of the proposed driveway to accommodate future development.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/11/2024 | RIGHT-OF-WAY REVIEW v.3 | 04/15/2024 | APPROVED |
03/19/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/22/2024 | REQUIRES RESUBMIT |
04/01/2024 | RIGHT-OF-WAY REVIEW v.2 | 04/11/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0324-00529
Permit Status: Complete
Permit Description: New Business project off Valencia Rd and Frost Dr for new development. The trench has been provided by the developer for most of the project- Southwest gas is just extending the gas line for 524' in dirt, east of the proposed driveway to accommodate future development.
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
03/19/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
03/19/2024 | Traffic control set-up approved between 9AM - 3:30PM |
03/21/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
12/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
12/12/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00529
Permite Description: New Business project off Valencia Rd and Frost Dr for new development. The trench has been provided by the developer for most of the project- Southwest gas is just extending the gas line for 524' in dirt, east of the proposed driveway to accommodate future development.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/18/2024 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | no barricades required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00529
Permit Description: New Business project off Valencia Rd and Frost Dr for new development. The trench has been provided by the developer for most of the project- Southwest gas is just extending the gas line for 524' in dirt, east of the proposed driveway to accommodate future development.
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/12/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | work has been complete. borderland dug trench as part of pia. passing precon due to fact I was inspector for pia and had discussed it with borderland Clint elder and saw gas at begging stages of pia. | |
06/18/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
06/18/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
06/18/2024 | TRSP - ROW - Final/Close-Out | Passed |