Permit: TR-UTL-0324-00514
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2641 E 5TH ST
Address NEW:
2641 E 5TH ST
Apply Date:
03/14/2024
Applicant:
Ilana Galluzzo
Description:
3' x 6' bell hole in pavement with an approx 2' x 6' trench in pavement, and an approx. 2' x 16' trench in dirt. Crews will be working West bound lane and North shoulder area to install new gas service.
Permit Reviews
Permit Number - TR-UTL-0324-00514
Permit Status: Complete
Permit Description: 3' x 6' bell hole in pavement with an approx 2' x 6' trench in pavement,
and an approx. 2' x 16' trench in dirt. Crews will be working West bound
lane and North shoulder area to install new gas service.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/14/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/20/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0324-00514
Permit Status: Complete
Permit Description: 3' x 6' bell hole in pavement with an approx 2' x 6' trench in pavement,
and an approx. 2' x 16' trench in dirt. Crews will be working West bound
lane and North shoulder area to install new gas service.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 03/14/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 03/14/2024 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 03/14/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
| 03/14/2024 | Prop 411 project work area, Contact Nick Germanos at Nick.Germanod@tucsonaz.gov prior to start of work. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00514
Permit Description: 3' x 6' bell hole in pavement with an approx 2' x 6' trench in pavement,
and an approx. 2' x 16' trench in dirt. Crews will be working West bound
lane and North shoulder area to install new gas service.
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/22/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/22/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 05/22/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 05/22/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 05/22/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 05/22/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 07/19/2024 | TRSP - ROW - Final/Close-Out | Passed |