Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4722 E GRANT RD
Address NEW:
4722 E GRANT RD
Apply Date:
03/13/2024
Applicant:
Desert Barricades LLC
Description:
continuation of TR-UTL-1223-03103"** Digging 50 ft in asphalt for new sewer connection on Mountain View Ave. and removing the old line.

Permit Reviews

Permit Number - TR-UTL-0324-00508
Permit Status: Complete
Permit Description: continuation of TR-UTL-1223-03103"** Digging 50 ft in asphalt for new sewer connection on Mountain View Ave. and removing the old line.
Start Date Submittal Complete Date Status  
03/14/2024 RIGHT-OF-WAY REVIEW v.1 03/15/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0324-00508
Permit Status: Complete
Permit Description: continuation of TR-UTL-1223-03103"** Digging 50 ft in asphalt for new sewer connection on Mountain View Ave. and removing the old line.
Total Outstanding Activity Conditions - 1
Date Name
03/14/2024 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0324-00508
Permite Description: continuation of TR-UTL-1223-03103"** Digging 50 ft in asphalt for new sewer connection on Mountain View Ave. and removing the old line.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/25/2024 TRSP - ROW - Backfill - Placement/Compaction N/A Partial Pass

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0324-00508
Permit Description: continuation of TR-UTL-1223-03103"** Digging 50 ft in asphalt for new sewer connection on Mountain View Ave. and removing the old line.
Total Completed Inspections - 4
Date Description Inspector Results Comments
03/25/2024 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed
04/03/2024 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed
04/16/2024 TRSP - ROW - Paving - Subgrade/removal/placement Passed
04/16/2024 TRSP - ROW - Final/Close-Out Passed