Permit: TR-UTL-0324-00507
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2034 S CALLE CORDOVA
Address NEW:
2034 S CALLE CORDOVA
Apply Date:
03/13/2024
Applicant:
ANGEL MORALES
Description:
P.067182B KAHNA - BORE 421' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 2,154' AERIAL CABLE.
Permit Reviews
Permit Number - TR-UTL-0324-00507
Permit Status: Complete
Permit Description: P.067182B KAHNA - BORE 421' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 2,154' AERIAL CABLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/14/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/20/2024 | REQUIRES RESUBMIT |
| 04/03/2024 | RIGHT-OF-WAY REVIEW v.2 | 04/10/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0324-00507
Permit Status: Complete
Permit Description: P.067182B KAHNA - BORE 421' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 2,154' AERIAL CABLE.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 03/14/2024 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 03/14/2024 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 03/14/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 03/14/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
| 03/14/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 06/03/2024 | Floodplain Use Permit Condition for Construction |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00507
Permite Description: P.067182B KAHNA - BORE 421' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 2,154' AERIAL CABLE.
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2024 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | new permit to be applied for. cot stated work can’t be completed until after monsoon season |
| 08/14/2024 | TRSP - ROW - Barricade Takedown | N/A | Re-inspection required | new permit to be applied for. cot stated work can’t be completed until after monsoon season |
| 08/14/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | new permits to be applied for. cot told them no work until monsoon is over |
| 08/14/2024 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required | new permit to be applied for. cot stated work can’t be completed until after monsoon season |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00507
Permit Description: P.067182B KAHNA - BORE 421' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 2,154' AERIAL CABLE.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/30/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work completed under a new permit TR-UTL-1024-01931 | |
| 04/30/2025 | TRSP - ROW - Barricade Takedown | Passed | Work completed under a new permit TR-UTL-1024-01931 | |
| 04/30/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work completed under a new permit TR-UTL-1024-01931 | |
| 04/30/2025 | TRSP - ROW - Final/Close-Out | Passed | Work completed under new permit TR-UTL-1024-01931 |