Permit: TR-UTL-0324-00504
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7102 E 29TH ST
Address NEW:
7102 E 29TH ST
Apply Date:
03/13/2024
Applicant:
Chelsey Bolinger
Description:
P.067182A KAHNA - TRENCH 15' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 3,135' AERIAL CABLE. PLACE (1) CABINET & (1) HANDHOLE
Permit Reviews
Permit Number - TR-UTL-0324-00504
Permit Status: Complete
Permit Description: P.067182A KAHNA - TRENCH 15' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 3,135' AERIAL CABLE. PLACE (1) CABINET & (1) HANDHOLE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/03/2024 | RIGHT-OF-WAY REVIEW v.2 | 04/11/2024 | APPROVED |
| 03/14/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/20/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0324-00504
Permit Status: Complete
Permit Description: P.067182A KAHNA - TRENCH 15' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 3,135' AERIAL CABLE. PLACE (1) CABINET & (1) HANDHOLE
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 03/14/2024 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 03/14/2024 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 03/14/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 03/14/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/14/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00504
Permite Description: P.067182A KAHNA - TRENCH 15' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 3,135' AERIAL CABLE. PLACE (1) CABINET & (1) HANDHOLE
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2024 | TRSP - ROW - AERIAL INSTALLATION | N/A | Re-inspection required | permit renewed site precon today |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00504
Permit Description: P.067182A KAHNA - TRENCH 15' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 3,135' AERIAL CABLE. PLACE (1) CABINET & (1) HANDHOLE
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/30/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | All work completed on new permit TR-UTL-1024-02004. | |
| 04/30/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | All work completed on new permit TR-UTL-1024-02004. | |
| 04/30/2025 | TRSP - ROW - Barricade Takedown | Passed | All work completed on new permit TR-UTL-1024-02004. | |
| 04/30/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | All work completed on new permit TR-UTL-1024-02004. | |
| 04/30/2025 | TRSP - ROW - Final/Close-Out | Passed | All work completed on new permit TR-UTL-1024-02004. | |
| 04/30/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | All work completed on new permit TR-UTL-1024-02004. |