Permit: TR-UTL-0324-00483
Permit Details
Apply Date:
03/12/2024
Applicant:
DOONE BAKER
Description:
P.099099 KAHNA (PREVIOUSLY APPROVED UNDER TR-UTL-1223-03107, expires 03/22/2024) - TRENCH 12' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 3,782' OF AERIAL CABLE. PLACE (1) CABINET, & (1) HANDHOLE
Permit Reviews
Permit Number - TR-UTL-0324-00483
Permit Status: Complete
Permit Description: P.099099 KAHNA (PREVIOUSLY APPROVED UNDER TR-UTL-1223-03107, expires 03/22/2024) - TRENCH 12' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 3,782' OF AERIAL CABLE. PLACE (1) CABINET, & (1) HANDHOLE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/12/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/15/2024 | APPROVED |
05/21/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/21/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0324-00483
Permit Status: Complete
Permit Description: P.099099 KAHNA (PREVIOUSLY APPROVED UNDER TR-UTL-1223-03107, expires 03/22/2024) - TRENCH 12' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 3,782' OF AERIAL CABLE. PLACE (1) CABINET, & (1) HANDHOLE
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
03/12/2024 | Traffic Control set-up approved between 7AM - 5PM |
03/12/2024 | Traffic control set-up approved between 9AM - 3:30PM |
03/12/2024 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0324-00483
Permit Description: P.099099 KAHNA (PREVIOUSLY APPROVED UNDER TR-UTL-1223-03107, expires 03/22/2024) - TRENCH 12' TO PLACE CTL CONDUIT & FIBER CABLE. OVERLASH 3,782' OF AERIAL CABLE. PLACE (1) CABINET, & (1) HANDHOLE
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/06/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
05/06/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
05/06/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
05/06/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
05/06/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
05/06/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
08/21/2024 | TRSP - ROW - Final/Close-Out | Passed |