Permit: TR-UTL-0323-01195
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2805 S KRAMER AV
Address NEW:
2805 S KRAMER AV
Apply Date:
03/29/2023
Applicant:
Rene Villalobos
Description:
wo#2503484 2805 s kramer av 14-14-29nw digsite is north of this lot at se corner of sunland and kramer - no parcel for that area - install new svc 4LF dirt
Permit Reviews
Permit Number - TR-UTL-0323-01195
Permit Status: Complete
Permit Description: wo#2503484 2805 s kramer av 14-14-29nw digsite is north of this lot at se corner of sunland and kramer - no parcel for that area - install new svc 4LF dirt
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/04/2023 | RIGHT-OF-WAY REVIEW v.1 | 04/07/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0323-01195
Permit Status: Complete
Permit Description: wo#2503484 2805 s kramer av 14-14-29nw digsite is north of this lot at se corner of sunland and kramer - no parcel for that area - install new svc 4LF dirt
| Date | Description | Comments |
|---|---|---|
| 04/07/2023 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. | |
| 04/07/2023 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0323-01195
Permite Description: wo#2503484 2805 s kramer av 14-14-29nw digsite is north of this lot at se corner of sunland and kramer - no parcel for that area - install new svc 4LF dirt
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2023 | TRSP - ROW - SITE INSPECTION | N/A | Complete (Recurring) | |
| 10/17/2023 | TRSP - ROW - Recurring | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0323-01195
Permit Description: wo#2503484 2805 s kramer av 14-14-29nw digsite is north of this lot at se corner of sunland and kramer - no parcel for that area - install new svc 4LF dirt
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/03/2024 | TRSP - ROW - Final/Close-Out | Passed |